Interactive laboratory
Drying Lab
Plan working time on the palette and painting.
Watch this tool · Part 4, 7:51 — Drying Lab: choose the conditions for your next session; transcript available.
A qualitative working-time guide. Paint formulation, room conditions and the real scrap swatch decide when a layer is ready.
Short working time
Short working time. layer thickness lengthens it; sealed surface shortens it; moving air shortens it.
| Factor | Direction |
|---|---|
| layer thickness | longer |
| sealed surface | shorter |
| moving air | shorter |
A stay-wet palette protects palette paint. It has no direct effect on the thin layer already on the painting.
Paint it on paper
Paint a thin stripe and a thick stripe on a scrap of your actual surface. Keep it beside the painting. Test that scrap with a clean damp brush before crossing the main layer. If it drags, lifts or mixes, wait longer.
About the model
A bounded illustrative score starts at a middle setting. Humidity and slow medium lengthen it; airflow, warmth, absorbency and large working areas shorten it. Paint amount and palette cover affect palette paint; thickness and support affect the painted layer. The displayed result is a qualitative band.
Compare the two locations with the same room conditions.